HABOM Floor

Project name

HABOM Aircraft Maintenance Facility

Year

2014

Location

Istanbul, Turkey

Application

Commercial Flooring

Advantages and Benefits

  • Shortened construction schedule by two months
  • Increased daily completion rates from 800 m² /day to 1200 m² to 1600 m²/day
  • Improved crack control
  • Increased durability and eliminated the risk of corrosion

Company

BarChip Inc.

Products

BarChip MQ58

Based at Istanbul’s Sabiha Gokcen Internation Airport (SAW) Airport, Turkish Technic has completed the ambitious construction of HABOM, a multi-story maintenance and repair facility, one of largest in the region. Macro synthetic fibre was used in 155,000 m2 of floor area.
The estimated total investment requirement for the airframe and component maintenance centres is around US$ 500 million. By the year 2020, HABOM is estimated to generate a US$ 1 billion share from airframe and component maintenance segments.

During construction, the contractor changed from a traditional steel mesh reinforcement system to macro synthetic fibre. Prior to the switch, 12 man crews were completing approximately 800 m2 per day using welded wire mesh reinforcement. After switching to macro synthetic fibres, 12 man crews were completing between 1200 m2 and 1600 m2 per day. Macro synthetic fibre eliminates the need to cut and place steel mesh, increasing productivity for significant time savings.

In all the contractor estimates that they realised a total time saving of approximately 35%, or two full months for the flooring project.