Project name
Scheldt Bridge
Year
2020
Location
Temse, Belgium
Application
Concrete Topping
Advantages and Benefits
Using synthetic fibres as alternative for steel mesh made the job much quicker, safer and more environmental friendly.
Company
ADFIL
Products
Durus EasyFinish – Crackstop
The Scheldt bridge in Temse is the longest bridge over water with a combined traffic of railways and cars. For the renovation the contractor was asked to install a crack-free and watertight pressure layer between the constructive concrete and the asphalt top layers.
The 4kg/m³ dosage of macro #synthetic #fibres and an extra 600g of micro synthetic fibres made this an efficient and easy job with good results.
This solution replaced a steel mesh and eliminated the risk for corrosion. The variable thickness of the pressure layer would have make the correct installation of a steel mesh almost impossible.
Get in touch
We are always looking for new exciting projects and collaborations.