
Project name
Yerköy-Sivas High Speed Railway project – Safety Tunnels
Year
2022
Location
Yerköy – Sivas, Turkey
Application
Shotcrete lining
TCDD Yerköy-Sivas safety tunnels were designed to provide rapid evacuation routes in case of emergencies such as fires or sudden stops within the main tunnels. One of the key challenges was eliminating steel mesh reinforcement while maintaining structural integrity and optimizing overall costs, including labor, materials, and time. Using Macro Synthetic Fibres, the shotcrete design successfully met energy absorption requirements, confirmed by EN 14488-5 testing, replacing conventional steel reinforcement with a fibres dosages varies from 3.5 to 5.0 kg/m³. By implementing fiber-reinforced shotcrete, the project achieved a safer, faster, and more cost-effective solution—enhancing construction progress and reducing material waste while ensuring long-term durability. With a 40 – 70% lower carbon footprint than conventional steel mesh, Macro Synthetic Fibres offered a sustainable, high-performance solution, reducing CO₂ emissions per cubic meter of concrete.
Get in touch
We are always looking for new exciting projects and collaborations.





